Expansion of the shift camp (40 places) at the Karatau mine in the Suzak district of the Turkestan region. Posted on September 1, 2021October 13, 2021 by admin
Construction (construction) of objects of the geotechnological landfill for 2021 of the Zapadny Mynkuduk mine in the Suzak district, Turkestan region Posted on September 1, 2021October 13, 2021 by admin
Expansion of production, installation and overhaul of SNK-3M columns at the Karatau mine in the Suzak district of Turkestan region Posted on August 19, 2021October 13, 2021 by admin
Overhaul of sludge settling tanks at the industrial site of the site No. 2 of the Karatau mine, located in the Suzak district of the Turkestan region Posted on August 19, 2021October 13, 2021 by admin
Technical re-equipment of steel pipelines in the TNS at the Budenovskoye-2 mine in the Suzak district of the Turkestan region Posted on August 19, 2021October 13, 2021 by admin
Expansion of production of the industrial site at the site № 4 of JSC ” JV ” Akbastau ” of the Budenovskoye field, located in the Suzak district, South Kazakhstan region Posted on August 19, 2021October 13, 2021 by admin
Construction of a 25% ammonia water warehouse, and a 25% ammonia water supply technological line to the existing uranium deposition unit of the PSV Mine of JSC ” JV “Zarechnoye” in the Otyrar district of the Turkestan region Posted on August 19, 2021October 13, 2021 by admin
Major repair of SZHR tanks item № 301-1 / 2 (replacement of metal structures) at the PSV mine of JSC ” JV “Zarechnoye” in the Otyrar district of the Turkestan region Posted on August 19, 2021October 13, 2021 by admin